Client

Internationally recognized perfume manufacturing facility in New Jersey

Scope of Work

The work area in their facility consisted of various sized tanks and equipment. The asbestos containing materials were located in the suspended drop ceiling, the pipe insulation and the spray- on fireproofing on the deck and beams. Due to the product's highly flammable nature, no spark could be allowed in the work area, so a special 10,000 square foot leak-proof scaffold was constructed, creating an isolated work area and special explosion proof equipment was brought in. As working in this facility required specialized equipment and work procedures, BEI has become the contractor of choice.


Client

A Federal building located in Washington, D.C.

Scope of Work

A subsstantial portion of this contract was the complete abatement of an active central utilities plant.  Work had to be coordinate with the complex's utility needs, other trades and the General Contractor's schedule.  Work included removal of an asbestos containing floor tile, pipe and duct insulation, and interior demolition.


Client

State-owned facility

Scope of Work

Removal of asbestos and PCB containing fireproofing, as well as floor tile and mastic, thermal insulation and the interior demolition on three floors of the former Pennsylvania Transportation and Safety Building. 

The entire site treated as a hazardous waste site

A special consideration for the project was an extremely tight time schedule required for completion.


Client

Chemical Manufacturing Facility

Scope of Work

When an internationally known chemical facility was forced to shut down it's New Jersey operations, The BEI Group, a long time asbestos and lead based paint removal contractor at the plant was called in to complete the asbestos remediation prior to dismantlement Over 12 miles of pipe, several towers reaching heights of up to 120 feet, and 20,000  square feet of vessels, all wrapped with asbestos insulation with a metal jacketing for weather proofing, is being removed and disposed of in an EPA approved landfill within a very strict time frame. Whether the job requires 10 men or 100 men, The BEI Group has broad resources to draw upon when required.


Client

High-Rise Office Tower

Scope of Work

The BEI Group was been retained for the asbestos abatement and re-fireproofing of a high profile 64 story office tower in a major metropolitan city. Each floor, consisting of approximately 40 square feet, was to be decontaminated (full deck fireproofing) and re-sprayed with non-asbestos fireproofing within a 30-day window of opportunity.

Running multiple shifts enabled BEI to complete the project ahead of schedule allowing the owner to complete more of the renovation work than previously planned. BEI was then awarded the operations and maintenance contract in the facility, guaranteeing service for this client well into the next millenium.

 